All-n-One Knitting Loom Launch
Last Minute Slouchy Hat. Video LAL Part I

Last Minute Slouchy Hat

Slouchy HatIt was Tuesday morning and it was my turn to carpool the kids to school. I was running around like crazy that morning and I hadn't even had a chance to change out of my pajamas. 6 kids were in the car waiting for me and the clock was ticking. I didn't had a chance to go upstairs and brush my hair and make myself look half-decent, but as I was going out the door, I saw my slouchy hat and put it on. In a second, I went from looking disheveled to presentable and that my friend's is how the name of the slouchy hat came to be. It is my last minute emergency tool! I love it! I hope you enjoy it as much as I do.

Materials

Loom: All-n-One Loom

Stitches: k, p, e-wrap, k2tog, yo.

Yarn: 130 yards of worsted weight
yarn. Araucania Aysen was used in sample (Less than 1 skein).

Notions: Knitting tool, tapestry
needle, and removable stitch marker.

Gauge: 8.5 sts= 2 inches in double ribbing

Size: Fits up to a head circumference of about 21 inches.

Level: Intermediate

Notes: Working clockwise around the knititng loom. The ribbing section is done with the knit Allnone-2stitch, may substitute with the flat stitch or the u-stitch. The rest of the hat is done with the e-wrap stitch. Important: Note that on Round 11, we move the first stitch one place to the left (clockwise) to keep the pattern slanted. We will use the stitch marker to keep track of our new Peg 1 position. We keep moving it after each pattern repeat so each time you do a row 11, you move the stitch marker over to mark the new Peg 1 position.

Knitting Loom Settings: set the knitting loom to 80 pegs (35 on each of the long rails and the two sliders). 


Abbreviations:
k=knit stitch
p=purl stitch
k2tog=knit two stitches together
yo= yarn over (simply e-wrap the peg that needs the yarn over)

Directions

Cast on 80 stitches, join to work in the round. Place stitch marker on 1st peg.

Round 1-8: *k2, p2; rep from * to the end of round.

Round 9: *yo, k2tog; rep from * to the end of round.
(How to:  *Move the loop from the first peg over to the second peg, first peg is empty, second peg has 2 loops on it. E-wrap the first peg thus creating the YO. Then ewrap the second peg, lift the bottommost two loops off the peg. Repeat from * to the end of round)

Round 10 and 12: Knit with the e-wrap method.

Round 11:  Move stitch marker one peg to the left (peg 2). This peg (peg 2) becomes Peg 1.  *yo, k2tog; rep from * to the end of round. (How to: see Row 9 on the break down).

Round 12: Knit with the e-wrap method.

Repeat Rounds 9-12: until item measures 9 inches from cast on edge.

Bind off with gather removal method.

Steam block to open the lace, be careful not to steam the ribbing portion as this will loosen the stitches.

Last Minute Slouchy Hat
Wanna do it but are worried about not being able to crank it out, no worries! Check back next week for a how to video :)! I got ya covered! In the meantime, go order your loom and your yarn and we'll see ya next week.

Happy looming!

 

 

Comments

Feed You can follow this conversation by subscribing to the comment feed for this post.

Isela

Jeannette, congratulations in naming the knitting loom! It is a great name and it is an awesome loom. I hope you receive it soon. You will love it. So many possibilities, it is fantastic! :)

Jeannette Pirkle

Mine is coming any day. I named it. I see you got to write up the patterns for it. Great job Isela as always you come up with items so quickly. I am excited to test drive this new loom too. I have checked the mail all week to see if it was there. Since I named it in the contest mine is supposed to be here this week, well, it this week is almost over. I know the post office is slow but they do deliver on Saturdays. I may have to wait a little bit longer but the anticipation is killing me. LOL

Jordans 2012

it is a crazy thing.i also like it.

The comments to this entry are closed.